Use more of the available site
We evaluate rooftops, facades, parking structures and open land instead of assuming that every project should follow the same layout.
Progress Sun connects field surveys, engineering, EPC delivery and owner-side supervision to develop solar solutions around the needs of each site.
Our role is to understand the site, connect technical decisions to real project conditions and carry that knowledge into delivery or owner-side supervision.
We evaluate rooftops, facades, parking structures and open land instead of assuming that every project should follow the same layout.
Drone imaging, GPS measurements, terrain models and contour data provide an evidence-based starting point for engineering decisions.
Engineering, procurement, installation, electrical integration, testing and commissioning are treated as one connected project process.
As Owner's Engineer, we review proposals and designs, coordinate suppliers and monitor construction from the owner's perspective.
At Koya University's Presidency building, Progress Sun is delivering EPC services for photovoltaic systems across rooftops, building facades and car-parking structures.
The project shows how a site-specific concept can use several parts of one property. Facade-mounted panels add productive vertical surface, while rooftop and carport arrays contribute to the wider campus solution.
Pre-construction surveys combine drone imaging, ground GPS measurements and engineering software to record the site's actual geometry and conditions.
The survey outputs help our team understand boundaries, terrain and land contours before layouts and civil works are developed. This supports planning based on recorded site conditions instead of assumptions.
Drone imagery and ground GPS measurements record the site.
Aerial mapping, terrain models and contours organize the field data.
The measured information informs layouts, technical design and planning.
The exact scope changes by project. What remains consistent is the connection between early decisions, technical detail and real delivery.
Feasibility, site selection, solar resource, grid access, market conditions and project constraints are reviewed before major commitments.
GPS and drone surveys, topography, mapping, energy-yield work and technical design translate site conditions into a project plan.
Procurement, installation, civil and electrical coordination, grid integration, testing and commissioning move the design into operation.
EPC and design review, supplier coordination, quality control and construction monitoring provide owner-side visibility and support.
Owner's Engineer
Technical and commercial consulting, digital mapping, civil and system design support, energy-yield work and construction supervision for an industrial project.
View project
Consulting & supervision
Support from feasibility and site selection before land purchase through EPC proposal review, design verification, monitoring and site visits.
View project
Installation & EPC
Design, installation, testing and commissioning for residential, commercial and industrial photovoltaic systems at smaller and mid-scale sites.
View systemsOur difference is not a single product. It is the way site information, engineering decisions and delivery responsibilities are kept connected.
Site conditions are recorded and reviewed before a technical concept is developed in detail.
Available surfaces, access, terrain, grid conditions and client goals shape the project approach.
Review, coordination and monitoring help the owner understand technical and construction decisions.
Testing, commissioning and grid integration are part of completing the system, not an afterthought.
We can support the next step—from feasibility and survey work to EPC delivery or owner-side supervision.